24 Hour Emergency

087 2818535

The installation was completed in a new build site and Darkin Group completed the Electrical and mechanical installation in conjunction with our M and E Engineer Brendan Jackson.

We designed and installed a full BMS system to incorporate the Electrical, Mechanical and ventilation system both for efficiency and safety interlocks, we had the panel constructed by MK
panels inchicore.

The premise is also 100% led and the romayos group is striving to convert the full group to Led lighting and with efficient controls.